Available nowNVIDIA HGX B200 GPU servers, built and in the Netherlands, available immediatelySee the offer
Blade AI Ltd · Registered in England and Wales · Company no. 17424857
We reply within one working day. · contact@blade-ai.co.uk

Market update · 7 October 2026

AI networking is running short.

Network cards, switches and optics are getting harder to buy. Here is what the supply chain is telling us this month, the part numbers most at risk, and what to do about it.

3 to 6 months
ConnectX-6 and ConnectX-7 network cards
38 to 52+ weeks
NVIDIA optical transceivers
441 days
Longest wait reported on 1.6T optics

What we are hearing

Three pressure points

Network cards

  • ConnectX-6 and ConnectX-7 lead times are running at 3 to 6 months.
  • DPU lead times are poor, so buyers are moving to ConnectX cards and adding to the demand.
  • A shortage of ConnectX-7 200G and 400G cards is expected in early 2027.

Switches

  • We are hearing of discount pricing being withdrawn on AI data-centre switches.
  • Buyers who lose their discount are paying around 10% more.
  • The cause is short supply, long lead times and rising demand.

Optical transceivers

  • NVIDIA transceivers are quoted at 38 to 52+ weeks.
  • Demand for 1.6T optics is forecast to more than double, from 33 million units in 2026 to 71 million in 2027.
  • The squeeze is inside the module: DSP chips, lasers and substrates.

Lead times and price movements are as reported to us by the supply chain in October 2026. They change quickly and differ by part and by buyer. The 1.6T forecast is from reported Goldman Sachs estimates, September 2026.

Most at risk

Part numbers flagged very high and high risk

Flagged for supply risk since 1 August 2026, highest first. Send us any of these part numbers, or your own list, and a director replies within one working day with price and lead time.

Part numberWhat it isSupply riskAction
MCX623106AN-CDAT NVIDIA ConnectX-6 Dx network card, 2-port 100GbE, QSFP56 Very high Request price
MCX755106AS-HEAT NVIDIA ConnectX-7 network card, 2-port 200GbE or NDR200 InfiniBand, QSFP112 Very high Request price
MCX75310AAS-NEAT NVIDIA ConnectX-7 network card, 1-port 400GbE or NDR InfiniBand, OSFP Very high Request price
MCX631102AN-ADAT NVIDIA ConnectX-6 Lx network card, 2-port 25GbE, SFP28 Very high Request price
920-9N42F-00RI-3C1
SN5610
NVIDIA Spectrum-4 SN5610 switch, 64-port 800GbE Very high Request price
920-9B36F-00RX-8S0
Q3400-RA
NVIDIA Quantum-X800 Q3400-RA InfiniBand switch, 144 ports of 800Gb/s Very high Request price
MMA1Z00-NS400 NVIDIA LinkX 400G SR4 transceiver, QSFP112, multimode Very high Request price
MCX623436AN-CDAB NVIDIA ConnectX-6 Dx network card, OCP 3.0, 2-port 100GbE Very high Request price
MMS4A20-XM800 NVIDIA LinkX 800G DR4 transceiver, single-port OSFP, single-mode Very high Request price
MSN2201-CB2RC
920-9N110-00R1-0C0
NVIDIA Spectrum SN2201 switch, 48 x 1G plus 4 x 100GbE High Request price
MSN4700-WS2RC NVIDIA Spectrum-3 SN4700 switch, 32-port 400GbE High Request price
MMS1V00-WM NVIDIA LinkX 400GbE DR4 transceiver, QSFP-DD High Request price
MMS1V70-CM NVIDIA LinkX 100GbE DR1 transceiver, QSFP28 High Request price
MMS4A00-XM NVIDIA LinkX 1.6T transceiver, twin-port OSFP, 2xDR4 High Request price
05-50077-00 Broadcom MegaRAID 9560-16i RAID controller High Request price
05-50077-01 Broadcom MegaRAID 9560-8i RAID controller High Request price
05-50123-00 Broadcom MegaRAID 9670-24i RAID controller High Request price
05-50148-00 Broadcom MegaRAID 9540-2M2 boot controller for two M.2 drives High Request price
05-50148-03 Broadcom MegaRAID boot controller for two M.2 drives High Request price

What to do now

Three moves to make this month

01

Order the network with the servers

Not after. The network can now take longer to arrive than the GPUs.

02

Buy optics with the switches

Optics have the longest wait. Put them on the first order, with the cables.

03

Line up a second source

Send us the part numbers early, before you need them.

Send us your part numbers.

NVIDIA network cards, switches and optics, sourced to order. Send the part numbers and quantities, or the networking section of your bill of materials. A director replies within one working day.

Blade AI is an independent supplier. Product names are trademarks of their owners and do not imply endorsement.

Email Get a quote