Live deals Have held stock, project excess or a cancelled order? Sell it

Buyer's guide · 5 November 2026

NVIDIA B200 or B300?

Most of the enquiries we see ask for the B300. On NVIDIA's own figures, the B200 does the same job for FP8 and BF16 training and most inference, costs around USD 100,000 less per server, and through our partners both are about 8 to 10 weeks from compliance, against around 36 weeks quoted direct. Here is the comparison, line by line, including where the B300 genuinely wins.

Same
FP8 and BF16 throughput, B200 and B300 (NVIDIA's own figures)
8 to 10 weeks
B200 or B300 new builds through our partners, against around 36 weeks quoted direct
USD 550,000 vs 650,000+
Typical 8-GPU system prices we are seeing: HGX B200 around USD 550,000, HGX B300 from USD 650,000

The short answer

Which one should you buy?

Buy the B200 if

  • You train or fine-tune in FP8 or BF16. Peak throughput is identical on both.
  • Your models and KV cache fit in 180GB per GPU, 1.4TB per server.
  • You run HPC, simulation or mixed workloads: the B200's FP64 is 296 TFLOPS against 10, and INT8 is 72 POPS against 3.
  • Peak FP8 and BF16 is all you need: the B200 costs less for the same throughput.

Buy the B300 if

  • You serve very large models and need 288GB per GPU, 2.1TB per server.
  • FP4 inference is your main workload: dense FP4 is 1.5x the B200.
  • Long-context attention dominates: NVIDIA quotes 2x attention performance.
  • You want 800G ConnectX-8 scale-out from day one and can wait for allocation.

Either way

  • NVLink is the same: 1.8TB/s per GPU, 14.4TB/s across the eight.
  • Both are Blackwell. Software, CUDA and the NVIDIA AI Enterprise stack are common.
  • Order the network with the servers. ConnectX cards, switches and optics have their own lead times.
  • Every GPU system is export-screened before we quote.

NVIDIA's own figures

HGX B300 and HGX B200, 8-GPU systems, side by side

From NVIDIA's HGX platform page, read on 5 November 2026. Tensor Core figures other than FP4 are the sparse specification NVIDIA publishes; dense is half. FP4 is shown dense.

SpecificationHGX B300HGX B200Edge
GPUs 8 x NVIDIA Blackwell Ultra SXM 8 x NVIDIA Blackwell SXM
GPU memory, total 2.1TB (288GB HBM3e per GPU) 1.4TB (180GB HBM3e per GPU) B300
FP4 Tensor Core, dense 108 PFLOPS 72 PFLOPS B300
FP8 / FP6 Tensor Core 72 PFLOPS 72 PFLOPS Same
FP16 / BF16 Tensor Core 36 PFLOPS 36 PFLOPS Same
TF32 Tensor Core 18 PFLOPS 18 PFLOPS Same
FP32 600 TFLOPS 600 TFLOPS Same
FP64 / FP64 Tensor Core 10 TFLOPS 296 TFLOPS B200
INT8 Tensor Core 3 POPS 72 POPS B200
NVLink, GPU to GPU 1.8TB/s 1.8TB/s Same
NVLink, total 14.4TB/s 14.4TB/s Same
Scale-out networking bandwidth 1.6TB/s (ConnectX-8, 800G) 0.8TB/s (ConnectX-7, 400G) B300
Attention performance (NVIDIA footnote) 2x 1x B300

Memory totals are as NVIDIA states them for the HGX baseboards; per-GPU figures are the physical HBM3e capacity. Networking bandwidth reflects the ConnectX-8 (B300) and ConnectX-7 (B200) adapters the systems ship with. Power is not a differentiator: NVIDIA lists both DGX systems at around 14kW.

Lead time

8 to 10 weeks, not 36

New-build B300, quoted direct

Around 36 weeks

What the major OEMs are quoting us for a new HGX B300 order as of 5 November 2026. An order placed today lands in mid-July 2027, before compliance and freight.

What Supermicro said

3 November 2026

On its first-quarter earnings call Supermicro said demand "far outstrips the availability of key components", that component shortages "continue to impact delivery timeline across the IT industry, even GPU", and that it ended the quarter with a record backlog.

Through our partners

About 8 to 10 weeks

New-build HGX B200 or HGX B300 systems through the partners we work with, about 8 to 10 weeks from compliance approval. Cancelled-order systems appear from time to time and usually sell within days: register for deal alerts to hear first.

Lead times and system prices are as quoted to us in November 2026 and change weekly; the B200 and B300 figures are typical prices for complete 8-GPU HGX systems, before networking, freight and taxes, and every quotation is confirmed in writing. Supermicro quotations are from the public transcript of its call on 3 November 2026.

The cost of waiting

What 36 weeks without the GPUs costs

Renting the same eight B200 GPUs on demand while you wait for a B300 build costs about USD 180,000 at the public median rate we saw on 5 November 2026 (USD 3.75 per GPU-hour). That is more than the B300 premium itself, before the revenue the capacity would have earned. Put your own numbers in.

Rental cost of the wait: USD 181,440GPUs x hours x rate. The median rate is from a public price aggregator on 5 November 2026; rates move daily and your contract rate will differ.

Why the B300 is scarce

Memory is the tightest part of the chain

01

HBM sold out

Micron said in January 2026 that its high-bandwidth memory was sold out for the year; SK hynix had said the same of its 2026 output. Memory makers are moving wafer capacity to HBM.

02

288GB needs taller stacks

Our reading: the B300's 288GB per GPU uses the tallest HBM3e stacks, the part hardest to get. The B200's 180GB stacks were in volume production first. That is one reason built B200 systems come free from cancelled orders while B300 stays on allocation.

03

The OEMs say so too

Supermicro's 3 November 2026 call: the range it can ship is governed by component supply, not by demand or build capacity.

Points 01 and 03 are from public company statements. Point 02 is Blade AI's interpretation of the market, not a manufacturer statement.

Live deals

Cancelled-order systems move in days

When a cancelled order releases built B200 or B300 systems, they usually sell within days. Register for deal alerts and you hear about the next one first; otherwise new builds are about 8 to 10 weeks through our partners.

Tell us the workload.

Send the model size, precision, GPU count and the date you need it. We will tell you straight whether the B200 does the job or whether you should hold out for B300, and quote accordingly.

Figures from NVIDIA's HGX platform and DGX pages and Supermicro's public earnings call, read on 5 November 2026. Blade AI is an independent supplier. Product names are trademarks of their owners and do not imply endorsement.

Email See live deals